Between Sunday 7th June and Sunday 14th June 2015 there was a considerable amount of class 31 action all over the country so rather than split all of the trips out to their separate railways I’ve included them in one post to show just what was on offer that week! Nene Valley Railway – 31271 Read the Rest…
The long awaited return to traffic of Peak Rail based 31270 occurred on 12th May when it replaced D8 as the diesel of choice on the booked service train; D8 needing to be taken out of traffic for repairs. 31270 would be rostered to work every train for the foreseeable future as no other diesel Read the Rest…
At Peak Rail the 2013 Season had been under way since January but no diesels came into the frame until March due to their service operating with steam only and terminating at Matlock Riverside to negate the need for a T&T loco. Due to D8 being out of service having some work done on it, 31270 Read the Rest…
Wednesday 8th August A normal day at Peak Rail, until the last train of the day that was. D8 had been out of service for repairs to a fluctuating power problem, that problem having been solved, apparently. It was given a test run vice the steam loco (68013) which needed attention to a spring as Read the Rest…
At Peak Rail 31270 had continued to work T&T with steam loco 68013 throughout the Summer and had been the only active diesel the railway had since D8 had been taken out of service in June to attend to low power issues. ‘270 had even worked the whole day’s service on its own on at Read the Rest…
During the Jubilee Weekend celebrations Peak Rail used 31270 on 4 consecutive days (Sat to Tue) as the T&T engine with steam 68013. It performed faultlessly, although it had developed an oil leak from somewhere in the region of its radiator elements since my last visit…….
May brought a 3rd visit to Peak Rail in quick succession. Despite the fact it was the Nene Valley Railway Diesel Gala the same weekend I’d decided I was going to Peak Rail on the Sunday for the rarer of the 31’s out that weekend, where I was starting to look like part of the Read the Rest…
A more mundane day at Peak Rail, post the Bank Holiday weekend, with 31270 T&T with steam 68013, the preserved worlds most reliable steam engine in existence………?
It was the Heritage Shunters Trust (HST) Gala at Peak Rail over the weekend of May 5th & 6th which also saw Peak Rail run their own service in conjunction, but not collaboration, sadly. On the Saturday D8 was T&T with steam loco 68013 on the Sunday 31270 was T&T with steam loco 68013. I Read the Rest…
An early start to the 2012 proceedings at Peak Rail, they could have picked a better day though. It was -5 overnight and felt that cold at Rowsley when we arrived, to find 31270 clouding the place out with white smoke. It hadn’t taken kindly to the cold start and we could see the smoke Read the Rest…